New Meter Connections for Commercial Projects
Installation and setup of new Gas, Electricity, and Water meters for new builds, extensions, and site refurbishments across the UK.
Simplifying New Connections for Your Commercial Build
Whether you’re building a new site or upgrading an existing supply, dealing with Distribution Network Operators (DNOs) and meter providers can be slow and bureaucratic. We manage the entire installation process for new Gas, Electricity, and Water meters, from initial application to final commissioning, offering a seamless, all-in-one solution.
Single Point of Contact for All Utilities
Dealing with three different network operators (Gas, Electric, Water) simultaneously is time-consuming. We act as your sole project manager, coordinating all trenching, connections, and appointments through one channel.
Cutting Through DNO & Network Bureaucracy
The application process requires technical specifications and takes time. We submit all required documentation, manage the communication with the DNOs, and chase timelines on your behalf to prevent project delays.
Secure Your Supply Contract Immediately
| A new meter needs a new supply contract. We secure a low-cost, fixed-term commercial tariff right away, avoiding the expensive default or ‘out-of-contract’ rates that new sites are often assigned upon connection. |
Our End-to-End Meter Installation Service
Our comprehensive service covers the two critical phases required to get your new site operational:
-
1. Infrastructure Coordination: We manage the complex interface with the DNOs (Electricity), Gas Networks, and Water companies for the installation of the physical pipes, cables, and final meter point.
-
2. Supply Contract Procurement: Crucially, we immediately secure a competitive supply contract post-installation. This ensures you avoid costly temporary or ‘default’ contracts, getting the best long-term tariff from day one of occupancy.
-
Seamless Process: By handling both the physical installation and the competitive contract procurement, we guarantee a faster, more efficient path to being fully operational. You provide the site details; we deliver the connected meter and the low tariff.
How Can Our Team Help You to Reach Your Goals
Meet Project Deadlines
We streamline the bureaucratic network process, mitigating delays often encountered when dealing with DNOs directly, helping you stay on schedule.
Achieve Cost Control
We secure fixed, upfront quotes for the connection work and the lowest competitive supply contract for the long term, ensuring budget certainty.
Ensure Right Capacity
We advise on and secure the correct Maximum Import Capacity (MIC) to ensure your new site can run all required machinery and services without costly future upgrades.
Simplify Project Management
By acting as your single point of accountability for all utility connections, we simplify a complex process for your site manager or building contractor.e
Your Change of Meter Questions Answered (FAQs)
Common questions on New Meter Changes
What happens if I miss the final meter reading deadline?
If final readings are not submitted promptly, the supplier may estimate usage, leading to a disputed bill. We guide you on securing and submitting accurate final readings on the day of occupancy to prevent overcharging.
How fast can you set up new contracts for a new premises?
We can typically secure and initiate the transfer of a competitive contract before you even move in, ensuring you avoid the expensive ‘deemed’ rates entirely. The full switch then completes within the usual 4-6 weeks.