New Meter Connections for Commercial Projects

Installation and setup of new Gas, Electricity, and Water meters for new builds, extensions, and site refurbishments across the UK. 

Engineers checking energy usage
WHY

Simplifying New Connections for Your Commercial Build

Whether you’re building a new site or upgrading an existing supply, dealing with Distribution Network Operators (DNOs) and meter providers can be slow and bureaucratic. We manage the entire installation process for new Gas, Electricity, and Water meters, from initial application to final commissioning, offering a seamless, all-in-one solution.

Dealing with three different network operators (Gas, Electric, Water) simultaneously is time-consuming. We act as your sole project manager, coordinating all trenching, connections, and appointments through one channel. 

The application process requires technical specifications and takes time. We submit all required documentation, manage the communication with the DNOs, and chase timelines on your behalf to prevent project delays. 

A new meter needs a new supply contract. We secure a low-cost, fixed-term commercial tariff right away, avoiding the expensive default or ‘out-of-contract’ rates that new sites are often assigned upon connection.
Preparing For Your Future

Our End-to-End Meter Installation Service

Our comprehensive service covers the two critical phases required to get your new site operational:

  • 1. Infrastructure Coordination: We manage the complex interface with the DNOs (Electricity), Gas Networks, and Water companies for the installation of the physical pipes, cables, and final meter point.

  • 2. Supply Contract Procurement: Crucially, we immediately secure a competitive supply contract post-installation. This ensures you avoid costly temporary or ‘default’ contracts, getting the best long-term tariff from day one of occupancy.

  • Seamless Process: By handling both the physical installation and the competitive contract procurement, we guarantee a faster, more efficient path to being fully operational. You provide the site details; we deliver the connected meter and the low tariff.

Our Process

How Can Our Team Help You to Reach Your Goals

01

Meet Project Deadlines

We streamline the bureaucratic network process, mitigating delays often encountered when dealing with DNOs directly, helping you stay on schedule.

02

Achieve Cost Control

We secure fixed, upfront quotes for the connection work and the lowest competitive supply contract for the long term, ensuring budget certainty.

03

Ensure Right Capacity

We advise on and secure the correct Maximum Import Capacity (MIC) to ensure your new site can run all required machinery and services without costly future upgrades.

04

Simplify Project Management

By acting as your single point of accountability for all utility connections, we simplify a complex process for your site manager or building contractor.e

FAQ

Your Change of Meter Questions Answered (FAQs)

Common questions on New Meter Changes

If final readings are not submitted promptly, the supplier may estimate usage, leading to a disputed bill. We guide you on securing and submitting accurate final readings on the day of occupancy to prevent overcharging. 

We can typically secure and initiate the transfer of a competitive contract before you even move in, ensuring you avoid the expensive ‘deemed’ rates entirely. The full switch then completes within the usual 4-6 weeks. 

Your liability officially ends on the date the keys are handed over, provided accurate final meter readings are submitted to your supplier alongside the new tenant’s details (if known). We ensure all closing documentation is correctly filed.
Why us?

You’ll Know What

You’re Getting Clarity in Comparison Confidence in Contracts
We are Transparent Like that. No Gimmicks.